FMG MODULAR CONVEYOR

PROJECT SUMMARY

This conveyor project comprised a 5km overland conveyor to tie mobile crushing facilities into FMG’s existing ore processing facilities at the Cloudbreak Mine. This $33m project was used to trial an innovative modular design enabling the conveyor and crushing facilities to be repositioned to exploit new ore bodies once existing deposits were depleted, reducing operating costs while extending the life of existing infrastructure. BIM Drafting worked collaboratively with RCR Tomlinson’s EPC Projects team to assist with the completion of design and drive schedule and costs savings with early lead-in steel detailing.

CLIENT

FMG

LOCATION

Pilbara, WA

SERVICES

3D laser survey, Design modelling & Shop detailing

PROJECT NUMBERS

Tonnes

5

Months

Project Value

PROJECT GALLERY

  • White LinkedIn Icon
  • White Facebook Icon
  • White YouTube Icon

Leaders in the delivery of 3D Modelling, Shop Detailing

& BIM Management

white bim final.png

Address:

Level 1, 516 Hay Street

Subiaco, WA 6008

© Copyright 2019 BIM Drafting Services PTY LTD.