top of page
AP5 PORT EXPANSION
PROJECT SUMMARY
BIM Drafting Services provided Detailing services of 5000 tonnes of FMGs fifth loading birth at Port Hedland. The scope included 300 meters of wharf deck and 7 dolphins. The project increased FMG’s export capacity to around 175 million tonnes per annum.
CLIENT
BAM Clough Joint Venture
LOCATION
Pilbara, WA
SERVICES
Shop Detailing
PROJECT GALLERY
![]() | ![]() | ![]() |
---|---|---|
![]() |
bottom of page